Tailored Power Quality and Protection Solutions

We work hand in hand with builders, engineers and electricians to design tailored power quality and protection solutions to meet the exact needs of a project.

We build in power justification to our solution, ensuring we bring the project in on budget and also provide long term ROI.

For some clients, we design temporary power solutions during a modernization process.

 

Our Engineering, Construction & Electrical Industry Clients Include

 

Lend Lease – Power On Australia has assisted Lend Lease many times over the last 10 years with power protection engineering advice as well as the supply of equipment required for their projects.  A key project was the Westfarmer’s Curragh Mining Project for which Power On Australia designed a series of customized DC Power Systems. This included  DC distribution and AC inverter using the very flexible Enatel Range of DC products and Powersonic Batteries.


Diverse Group Australia – Power On Australia worked closely with Rio Tinto’s Hybrid Power project to devise a list of raw parts required from the Eaton DC Range for Diverse Group to integrate.


Downer Group – For many years Power On Australia has supported Downer with power protection and quality engineering and advice to ensure their projects always finished on time and within budget.  Key projects  include Wheatstone, Mt Pleasant, Rubyanna, Lower Molonglo and Ravenshoe Waste Water Treatments Plants, as well as the ARTC HV Upgrade Project, Casurina Substation Project and the Ararat Wind Farm Project.


ABB Group – Power On Australia partnered with ABB on the Anglo Grosvenor Project to devise the winning solution for their power protection requirements.  This included a roll out of customized UPS, distribution and battery solutions all housed in a robust IP55 cabinet suitable for remote site use and access.  


J.A.Martin Electrical – Power On Australia partnered with J.A.Martin on the Moolarben Coal Project, devising two 10kVA UPS Units which incorporated a suitable isolation transformer and ample battery autonomy to suit the site’s needs.  Feedback from the client is that Power On Australia went above and beyond to ensure the equipment required by the project was delivered on time and produced the desired result.

Enquire Now

  • Hidden
  • This field is for validation purposes and should be left unchanged.

We’ll keep the power on

Whatever the situation